🎧 Earned Value Analysis – Full Study Album

This album turns EVM formulas into sound cues you can remember under pressure.
Each track covers one core metric or forecast concept from the Control Costs process.
Play them in order to feel the flow of performance measurement.


Planned Value cover

1. Planned Value (PV)
The work you *planned* to have done by now.

Earned Value cover

2. Earned Value (EV)
The value of the *actual* progress achieved.

Actual Cost cover

3. Actual Cost (AC)
The amount you’ve *actually* spent to date.

CPI cover

4. Cost Performance Index (CPI)
Efficiency of cost use — EV divided by AC.

SPI cover

5. Schedule Performance Index (SPI)
Efficiency of time — EV divided by PV.

SV cover

6. Schedule Variance (SV)
EV minus PV — the schedule gap in value terms.

CV cover

7. Cost Variance (CV)
EV minus AC — what you saved or overspent.

BAC cover

8. Budget at Completion (BAC)
Total planned budget for the full project.

EAC cover

9. Estimate at Completion (EAC)
Expected total cost based on current trends.

ETC cover

10. Estimate to Complete (ETC)
How much more you’ll likely spend to finish.

VAC cover

11. Variance at Completion (VAC)
BAC minus EAC — your expected overrun or underrun.

TCPI cover

12. To Complete Performance Index (TCPI)
The efficiency needed to meet the goal from here.


Each song reinforces a formula, a ratio, or a forecasting mindset.
Repetition builds recall — listen until the math becomes rhythm.